mechanical maintenance regularly is the best way of maintaining mechanical life and stable performance, the following is the machine general maintenance projects, in addition to the operating and maintenance personnel, the rest of the staff to ban this machine for maintenance, maintenance is turn off the power supply, lest produce risk.
1, before the machine conveyor belt must work every day, use dry clean air compressor to blow.
2, residue recycling shaft maintenance:
(
1)
Maintenance once a month.
(
2)
To fix recycling wheel nut to be removed, remove the spring and gather round.
(
3)
In axis and recycling wheel contact surface coated with butter, to keep them gather round smooth operation.
3, sealing and cutting edge found shrink film residue, please gently remove the surface residue with soft wood, banning the use of metal cleaning, metal friction would destroy his sword of protective film, reduce the sealing function.
note: don't try to shave their seal the surface of the cutter, because it will affect the sealing and cutting knife sealing effect.
4, bearing and bearing maintenance: about once every three months to maintain, it on the machine surface, and have the part of the bearing and the bearing seat with hydraulic oil droplets in the interior of the bearing contact with the mandrel clearance in lubrication and guarantee the machine surface clean.
5, chain and sprocket maintenance: about once every three months to maintain, first remove the shield driving part, use butter chain and sprocket wheel contact clearance, maintenance after pay back cover.
6, the belt after a period of time after the operation, the belt will relax, such as belt cannot close drive, is the firmness of the belt can be adjusted.
7, check whether the cutter fixed screw locking, if the case of a loose to lock it.
(
1 times per month)
8, article examines sealing silicone on the teflon tape, if there is any breakage, needs to be updated.
9, if the teflon on the incision knife is off and the film is easy to paste on the cutter to cut knife to sealed with teflon treatment or change new knife.
10, electric heat pipe replacement: when its not after heating, electric heating tube must be replaced the electric heat pipe.
(
1)
Replacement of electric heat pipe before must first determine whether the voltage and wattage of electric heating tube, then the power is turned off, electric heat pipe waste heat elimination.
(
2)
Will be located in the match in the box electric heat pipe lines to be removed.
(
3)
Remove the fixed screw loosening, electric heating tube, electric heating tube to put new electric heat pipe in again.
(
4)
Make sure all screws are already fixed lock, connect all lines after the lock with a box.
keep good lubrication: 11, lifting screw about maintenance once a month, first remove the outer baffle with yellow
oil daub T screw contact with T type nut clearance (
As shown in figure 7.
2)
Up and down, then turn the regulating handle lifting gear adjustment, can make the lubricating oil, sufficient lubrication maintenance after installed back to the baffle.
12, heat-resistant rubber or heat resistant tape replacement:
(
1)
Will power off after being keypad to eliminate electric heating tube, tearing up the heat resistant adhesive.
(
2)
Remove heat resistant rubber, replace the new heat resistant rubber, with a knife and two concave installation to ensure that the surface completely flat, remove is too long and the spare parts.
(
3)
Again affix heat resistant tape, pay attention to put a tape must stick flat with no buckling phenomenon.